Guide To Our Asphalt

The Ultimate Guide to Quality Asphalt Paving in the GTA

Contact Us for a free estimate!

AJ Concord offers free, no-obligation estimates to help you plan your next highway or construction project with confidence.

What Makes Durable Paving? Materials, Methods & Local Expertise

When you’re considering asphalt paving for your driveway, parking lot, or industrial site, the secret to lasting results lies in top-quality materials and precision installation. Here’s how AJ Concord (a trusted GTA contractor) delivers excellence from excavation to surface.

1. Choosing the Right Asphalt Mix

Prominent paving experts in the GTA rely on proven asphalt types tailored for both residential and commercial applications ajconcord.com+2ajconcord.com+2ajconcord.com+2:

  • HL8 Base Asphalt – A coarse, structural mix that forms a robust foundation, designed to support heavy vehicle traffic and prevent cracking.

  • HL3 Surface Asphalt – A smooth, fine finish layered on top, providing weather resistance and a clean, aesthetically pleasing surface.

  • SP 12.5 (Superpave) – A premium-quality mix used for high-traffic or industrial areas, offering enhanced durability and resistance to rutting under extreme temperature swings .

2. Pro-Level Installation Process

Here’s how professional contractors like AJ Concord ensure long-lasting paving:

  • Full Excavation & Base Preparation: Old asphalt is removed and subgrade is graded. A compacted HL8 base is laid for structural strength.

  • Shave & Pave Resurfacing: Ideal for revitalizing worn surfaces—old layers are shaved off, and fresh HL3 is applied for a cost-effective upgrade.

  • Custom Mixes for Specific Needs: For driveways, lots, or industrial yards, mixes can be adjusted to match load demands and climate conditions.

3. Local Expertise Across the GTA

AJ Concord brings this expertise to homeowners and businesses in Mississauga, Oakville, Burlington, Milton, Brampton, Vaughan, Etobicoke, Hamilton, and Toronto—backed by their reputation as a trusted general contractor handling everything from interlocking patios to sod installation ajconcord.com.

Unlike one-size-fits-all services, they offer tailored solutions—matching asphalt types, damage levels, and project scopes to the right method, ensuring you receive the best value and outcome.

4. Why It Matters in Ontario

Ontario’s freeze-thaw cycles and variable weather wreak havoc on low-grade paving. By using HL8 and HL3 mixes—and optional SP 12.5 where needed—contractors account for temperature fluctuations, drainage needs, and traffic loads. Proper base installation and surface compaction with these materials mean fewer potholes, cracks, and expensive repairs down the line.

5. The Role of Quality & Temperature in Asphalt Longevity

Asphalt may look the same on the surface, but not all paving jobs are created equal. The quality of materials used and how well they’re installed matter even more in climates like Ontario’s, where temperatures swing from -30°C in winter to 35°C in summer.

When asphalt isn’t properly mixed, laid, or compacted, it becomes highly vulnerable to cracks, shifting, rutting, and water damage. That’s why top-tier contractors rely on durable, high-performance materials

Invest in Long-Term Performance

Don’t settle for quick fixes or thin, unstable overlays. For a driveway or parking lot that withstands climate fluctuations and traffic, you need:

  1. The right asphalt mix (HL8, HL3, SP 12.5)

  2. Expert installation and grading

  3. Seasonal maintenance and quality drainage

If you’re in the GTA or Southern Ontario, reaching out to a contractor like AJ Concord—well-versed in these materials and methods—is your best step toward a paving job that looks great and lasts decades.

Our Clients

Request a Quote

Ready to Work Together? Build a project with us!

Learn More From

Frequently Asked Questions

AJ Concord specializes in a wide range of construction projects, including residential builds, commercial construction, industrial facilities, and MTO projects, ensuring high-quality results and on-time delivery for every client.

AJ Concord uses detailed project management techniques, including careful budgeting, regular progress assessments, and effective communication with clients and subcontractors, to ensure every project stays on schedule and within budget.

Yes, AJ Concord is committed to sustainability and offers green building solutions such as energy-efficient designs and the use of eco-friendly materials, helping clients reduce environmental impact while improving the long-term value of their properties.